Status of the Work in Erstfeld
On the installations site of the contractor of Lot 151, dismantling and removal work continues.
The bitumen and concrete surfaces have been largely removed. The railway tracks of the construction site railway station at Erstfeld are now being dismantled. The ballast around the railway loading bay has been removed.
State: Mai 1, 2012