Ceneri Base Tunnel: almost 90 percent of the railway instrastructure have been installed

Work on the Ceneri Base Tunnel is on schedule. In total, almost 90 percent of the railway infrastructure systems have been installed. The preparations for test operation are also proceeding at full speed.